"Framing inspections has passed! Insulation was on schedule for Thursday but the weather has caused it to move to today. Inspection is schedule for Monday. My plan is to be hanging sheetrock at some point next week. This weather is really causing issues. Siding has been delivered and will start Monday if the weather gets better."
Wow! What an exciting update and it was even more exciting when we rolled up to the house to see the updates in person! The exterior walls have insulation installed and the sheetrock is stacked throughout the house ready for installation. The siding crew was there when we pulled up. They were having lunch in the garage and I asked if it would be okay for us to go in and look around. We stayed out of their way as we marveled at all of the updates. It's all coming together and we feel so lucky that we get to watch it happen!
|
Cruising up to the house and people are working on it! |
|
She's getting dressed! |
|
Back side is still naked. |
|
Both sides have the siding and they were working on the front when we got there. |
|
The concrete on the front porch has been poured |
|
There was drywall stacked throughout the entire house |
|
Dining room and living room |
|
Ge-Ge's bathroom |
|
Insulation on the stairs |
|
Insulation in Kate's room |
|
Insulation in Sam's room |
|
Insulation in Jack's room |
|
Insulation in the master bedroom ceiling |
|
Insulation in the hallway ceiling |
|
Master bedroom |
|
Master bedroom with insulation and drywall ready to be installed |
|
More drywall stacked in the master bedroom |
And for those of you who requested more updates from Jack...