09 February 2021

Shawn Says...Part 10

"Plumbers have completed the rough in. Electricians will be completed with rough in on Monday. Inspections will take place next week. Temperatures should allow me to get the plumbing inspection next week. We will have to see, weather has not been helping lately. If we having freezing temps we have to wait it out. Inspections has to be done with water in the lines. I am hopeful that we can get it done and move on to the framing inspection next week. Think warm thoughts."

I think our warm thoughts have been working! It got up to 65˚F today! Hopefully, the inspection can happen before the cold front comes through at the end of the week!

We were excited to see lots of changes this week after several weeks of lackluster changes. Not only is the plumbing complete but there was a lot of mechanical/electrical in place as well!

Things to note in this picture: electrical wires for our
outdoor garage lights, and siding go up on the neighbors house!


A great view into the crawlspace (never thought I'd utter those words)


Safety first!


Lots of wiring to help light the living room ceiling


Dining room lighting


Ge-Ge's shower - she didn't want to model it

Kate modeling her bathtub/shower


Master shower


Master bath actually in the master bathroom this week


Laundry room hook ups


Some light switch boxes and outlet boxes
in place in Jack's room


Our backyard neighbors who are also some of our really good friends!!!


Some insulation just thrown into Sam's room


Jack modeling the boys' bathtub 


Sam showing off the boys' tub


Ge-Ge making her way down the make-shift garage steps