"Plumbers have completed the rough in. Electricians will be completed with rough in on Monday. Inspections will take place next week. Temperatures should allow me to get the plumbing inspection next week. We will have to see, weather has not been helping lately. If we having freezing temps we have to wait it out. Inspections has to be done with water in the lines. I am hopeful that we can get it done and move on to the framing inspection next week. Think warm thoughts."
I think our warm thoughts have been working! It got up to 65˚F today! Hopefully, the inspection can happen before the cold front comes through at the end of the week!
We were excited to see lots of changes this week after several weeks of lackluster changes. Not only is the plumbing complete but there was a lot of mechanical/electrical in place as well!
|
Things to note in this picture: electrical wires for our outdoor garage lights, and siding go up on the neighbors house! |
|
A great view into the crawlspace (never thought I'd utter those words) |
|
Safety first! |
|
Lots of wiring to help light the living room ceiling |
|
Dining room lighting |
|
Ge-Ge's shower - she didn't want to model it |
|
Kate modeling her bathtub/shower
|
|
Master shower |
|
Master bath actually in the master bathroom this week |
|
Laundry room hook ups |
|
Some light switch boxes and outlet boxes in place in Jack's room |
|
Our backyard neighbors who are also some of our really good friends!!!
|
|
Some insulation just thrown into Sam's room |
|
Jack modeling the boys' bathtub |
|
Sam showing off the boys' tub |
|
Ge-Ge making her way down the make-shift garage steps |